Building Excellence, Maintaining Trust

Here at PMCS, we do things a little bit differently than the standard inspection service. First off, everything is included in each inspection cost. If we become your inspector, we review and handle all of the inspection and corrosion related issues on your tanks or pipes, period. No hidden fees, no extra costs, nothing. We offer full audit support, full file reviews, inspection of repairs, etc. It’s all included. Anything you need mechanical integrity and corrosion related for the inspected piece of equipment is 100% included in the cost until the next inspection is due on that piece of equipment. We charge a flat rate per vessel, always. No matter what we find or how long it takes, the price does not change. We also guarantee a preliminary report on your equipment before we leave site, with the final report to you in no more than 7 days. You will know if we think there is something wrong before we leave, and we will do an in-depth analysis of your vessel and then send a final report after. We also store digital and paper copies of every inspection we perform for you, forever, at no additional cost. We all know that if you don’t have the paperwork to prove it, then it never happened. So we guarantee that you will never lose a copy, because we back it up for you, forever. Lastly, we guarantee availability to do inspections on your schedule. Got a turnaround or plant outage coming up? We will be there. Every day, for as long as it takes to get your equipment tested in the time frame you have available, all for the same flat rate fee for the inspection. We don’t charge overtime, or any other hidden fee. Ever. Period.

Located in beautiful upstate South Carolina, PMCS is a veteran owned company. We take pride in our service, and want to give you the absolute best inspection service you have ever had.

Request a Tailored Project Consultation

Submit the brief form below to discuss objectives, timelines, and the strategic approach that will bring your inspectionproject from concept to completion.